
Roof replacement in Orlando
Down to the deck, re-nailed to code, and every sheet of rotten plywood counted in front of you. The price is in writing before anything comes off.
Is this you?
Signs it may be time for a new roof

Tabs that crack when lifted
If a shingle breaks when it’s lifted, a repair breaks more than it fixes.

A soft or stained deck
Dark staining or soft sheathing under the shingles means water has been getting in for a while.

Shingles lifting or going missing
When the sealant strips have let go across a slope, each blow takes a few more.
How we do it
A new roof, in the order it goes on
Tear-off, in sections
Only as much comes off as we can dry in before the afternoon storm.
Deck repaired and re-nailed
Rotten sheets cut out and replaced, then the whole deck re-nailed to code.
Dried in
Membrane at every eave and valley, synthetic underlayment, drip edge the right way round.
Metal, shingles, cleanup
New flashing, six nails a shingle, and a magnet over the yard twice.
What it costs
What decides the price of a new roof
Every roof is priced on its own written scope after we’ve been up on it and in the attic. These are the things that move the number.
The size and shape
How many squares, and how many valleys, walls and chimneys. Flashing is slow work.
The deck underneath
Rotten sheets are priced per sheet in advance, so the one unknown has a known price.
What goes back on
The shingle line, the metal and the ventilation fixes you choose, each shown as its own line.
The details
For the people who want every step
Tear-off, in sections
The old roof comes off to bare deck, and it comes off in sections rather than all at once. That is not caution for its own sake — it is so that no more of your house is open at four in the afternoon than we can dry in before the storm that arrives most summer days around four-thirty. Shovels, then a scrape for the old nails, then a broom, because a nail head left proud telegraphs through a new shingle and you will see the line from the street in a year.
Reading the deck while it is open
This is the ten minutes of the job that nobody else gets to see. Sheathing gets walked and sounded. Soft plywood, delaminated plies, black staining around a chimney or a valley, and the classic one — sheathing that is fine everywhere except a two-foot circle under an old boot — get cut out at the framing and replaced with 15/32 CDX, H-clips at the unsupported edges so the new sheet cannot ride against the old one.
You get the count while the deck is open. Not on the invoice at the end: on the day, out loud, with the sheets on the ground where you can see them. Deck is the only genuinely unknown quantity in a re-roof and it is the one every argument in this trade is about, so it is priced per sheet in the signed scope before anybody climbs a ladder.
The re-nail, which is the part the code cares about
Once the deck is sound, the whole roof is re-nailed: 8d ring-shank, 6″ on center, in the field and at the edges, into the rafters or trusses. Not just the sheets we replaced — all of it. Florida asks for this on a re-roof, and it is worth understanding why. A deck put down in the seventies or eighties was often fastened with smooth-shank nails at whatever spacing was quick, and a smooth shank in dry southern yellow pine backs out over thirty years of thermal cycling. Ring shank does not. In a serious wind the failure is rarely the shingles — it is the sheathing leaving the truss and taking everything with it.
It takes a couple of hours and it is only possible with the roof off, which is the third and best argument against an overlay.
Dry-in
Self-adhered membrane goes down first where water is most likely to sit or back up: a 36″ course along every eave, up both sides of every valley, and around chimneys and skylight curbs. Then synthetic underlayment over the field, lapped and capped, not stapled.
Drip edge is the detail people get backwards. At the eaves it goes on the deck under the underlayment, so anything that gets past the shingle runs onto the metal and out into the gutter. At the rakes it goes over the underlayment, so wind-driven water running down the rake cannot get under it. Eaves first, then underlayment, then rakes. We use 8″ aluminum, not the 2″ hemmed strip that comes on a lot of production houses and rolls in the first serious storm.
Metal, then shingle
Valleys get 24″ W-profile galvanized metal over membrane, and we run them open: the shingles are cut back about 3″ either side of the center rib and clipped, so the valley is a channel rather than a woven mat of shingle that holds grit and slows water down. Step flashing at every wall, new, on every course — not the old flashing bent back and re-used, which is what the caulk in somebody else's repair was hiding.
Then the field. Starter course at the eave and up both rakes with the sealant strip to the edge, architectural shingle, six nails per shingle in the printed nailing strip, driven flush and square. Ridge cut for vent, cap over it.
And the ground
Tarps and plywood over the beds, gutters cleaned of the granules and nails that always end up in them, and a rolling magnet twice over the drive, the paths and the lawn, in two directions. Grass hides a nail lying flat; one pass is not enough.
Re-roof specification
Old roofRemoved to bare deck, in sectionsDeck repair15/32 CDX, H-clips, priced per sheet in advanceDeck re-nail8d ring-shank, 6″ o.c., whole roofEave membrane36″ self-adheredValleysSelf-adhered + 24″ W-profile metal, open cutUnderlaymentSynthetic, cappedDrip edge8″ aluminum — under at eaves, over at rakesShingle nails6 per shingle, in the nailing strip, flushFlashingAll new. Nothing bent back and re-usedVentilationRidge cut and vented, intake checked and correctedCleanupMagnet, twice, in two directionsNot offeredOverlay over existing shinglesQuestions
What people ask us about this
How long does a re-roof take?
A straightforward single-story house is usually two days: tear-off, deck work, re-nail and dry-in on the first, shingles and cleanup on the second. You get a day count with the scope.
Will you put a new roof over the old one?
No. An overlay hides the deck, adds weight and usually voids the shingle warranty. It also rules out the deck re-nail.
Do I need to be home?
Not for the work. If you can, be there for the deck count and the final walk-through. Move the cars out of the drive and take breakables off the walls under the roof.
What happens to my yard?
The beds get tarped, the gutters get cleared, and a rolling magnet goes over the drive and the lawn twice, in two directions.
Get a straight answer about your roof.
Tell us what it’s doing. We’ll look at the roof and the attic and put it in writing.
Other work