Skip to content

On the full site

We’ll build this page:

This free preview shows the home page. Every page in the menu gets built when you say go.

House with a screened porch under a deep roof overhang

Eight kinds of job. They are not variations on each other.

Most screen companies list “rescreens and repairs” and let you work out the rest. These eight things fail differently, get priced differently, and only some of them involve the building department. If what you need is not here, we will tell you who does it rather than learn on your cage.

Every quote

Which mesh, which spline gauge, which anchors, and what the frame was engineered to hold — written on the quote. Nothing is priced from a photograph; somebody walks the structure first.

Request a measure →
Schedule S-1 — work, specification and permit status
WorkWhat it actually isSpecified asPermit
Full rescreenEvery panel out, every groove cleaned, all new spline. The job you do once instead of chasing panels for three seasons.18×14 / 20×20 / petPermit: no
Panel repairOne or two panels replaced in an otherwise sound cage. Honest about the fact that a new panel looks new..140 vinyl splinePermit: no
Storm repairFrame first, mesh second. A blown panel with a straight frame is the system working; a bent beam is not a screen job.Frame assessed firstPermit: sometimes
New enclosureEngineered drawings, a design wind speed for your address, a permit, and beam sizes that suit the span.Engineered, sealedPermit: yes
Pool cage rebuildWhen the frame, not the screen, has reached the end. Partial rebuilds, beam and post replacement, re-anchoring.2x5 / 2x6 SMB postsPermit: usually
Screen doorsThe part of a cage that gets used ten times a day and is built like the part that never moves.Corner keys, brace, closerPermit: no
Front entry screensEntryways and porch screening — smaller spans, tighter tolerances, and it is the first thing anyone sees.Framed to the openingPermit: sometimes
Aluminum railingsPool deck, porch and balcony rail. Load-rated, and the posts are anchored the same way the cage posts are.Load-rated, powder coatPermit: sometimes
A house with a screened porch under a deep roof overhang

Sheet A-2 — details

One drawn detail for every row of the schedule above.

A schedule tells you what the work is called. A detail tells you what it actually consists of, which is the part that decides whether it lasts. These are the ten we get asked about most, drawn the same way they are specified on your quote.

Detail 1/A-2Spline in its channel
Spline in its channelThe groove is the whole job. New mesh rolled into a channel still packed with twelve years of old vinyl and grit sits proud, never seats evenly, and is the panel that leaves first in a blow. Full rescreen →
Detail 2/A-2Kick plate at the deck
Kick plate at the deckTwenty inches of solid panel across the bottom of the bay, where dogs, mowers, chairs, feet and hoses live. It costs less than replacing the same lower panels every year and far less than framing. Panel repair →
Detail 3/A-2Beam splice after a blow
Beam splice after a blowScreen is meant to let go. A frame member is not. A splice that has opened is a structural question, and it gets answered before anybody prices mesh. Storm repair →
Detail 4/A-2Super gutter at the fascia
Super gutter at the fasciaThe gutter is not drainage that happens to be there. On most cages it is the member the roof panels hang from, which is why standing water in it is a structural problem as well as a mosquito one. New enclosure →
Detail 5/A-2Base anchor and its embedment
Base anchor and its embedmentThis is where old cages actually fail. New anchors go in fresh holes with the old ones filled — a corroded anchor re-torqued in a tired hole is not a repair, it is a hope. Pool cage rebuild →
Detail 6/A-2Hinge stile, brace and closer
Hinge stile, brace and closerThree hinges, a braced diagonal and corner keys that are doing the work. A door is the only moving part of a static structure and it has to be built like one. Screen doors →
Detail 7/A-2Scribed jamb at an entry
Scribed jamb at an entryAn entry opening is never square. The frame is set truly plumb and the closure is scribed to whatever the column actually does, so the gaps read as an even line rather than a wedge. Front entry screens →
Detail 8/A-2Rail post and top rail
Rail post and top railA rail required for a change in level has to be load-rated, and it only holds that rating if the anchors do. Same deck, same anchor question as the cage posts beside it. Aluminum railings →
Detail 9/A-2Corner post, plan
Corner post, planThe corner post carries two beams and the uplift from both. The tie plate and the fastener count come off the engineering for your address, not off what happens to be in the van. New enclosure →
Detail 10/A-2Chair rail, section
Chair rail, sectionThe chair rail is where the mesh is allowed to change. Pet mesh below it where the animal actually reaches, standard mesh above, and a straight line between the two so it reads as deliberate. Full rescreen →

Screen work

Panel repair is the smallest thing we do and often the right one. If the frame is sound and two panels have torn — a branch, a chair leg, a ball — there is no reason to rescreen a cage that is otherwise doing its job. We will say so.

A full rescreen is what a cage past roughly its first decade usually wants. Mesh ages by ultraviolet exposure, and every panel on your cage has had the same exposure. When one goes, the rest are not far behind, and the difference in cost between doing them together and doing them one at a time over three years is not close.

Kick plates are the solid panels along the bottom of the wall bays, usually sixteen to twenty inches high. They exist because the bottom of a screen is where dogs, mowers, chairs, feet and hoses live. Adding them where they are missing is cheaper than replacing the same lower panels every year, and much cheaper than framing.

Frame work

Storm repair begins as an inspection, not a quote. Screen is meant to blow out; that is the panel acting as a fuse so the frame survives. What we are looking at after a storm is whether the fuse did its job or whether the frame took the load: beams out of line, splices opened, posts out of plumb, base anchors moved.

Rebuilds range from replacing a single beam to taking a wall down to the deck and putting a new one up. Where structural members change, so does the permit position, and we sort that out before anything is ordered.

New enclosures come with engineered drawings sealed for your address and its design wind speed. That is not optional paperwork — it is what makes the difference between a cage and a large aluminum kite.

Doors, entries and rail

Screen doors are the moving part of a static structure and they are usually built like the static part. A door is a light aluminum rectangle with nothing resisting diagonal movement, so every time it is pulled, slammed or leaned on, it racks a little further out of square and starts dragging on the corner diagonally opposite the hinges. Tightening the corners does not hold. It comes back.

Front entry screening is a different discipline to a pool cage. The spans are short, the openings are rarely square, and everybody who comes to your house looks at it from three feet away. Tolerances that would be invisible on a forty-foot cage are the whole job here.

Railings come from the same aluminum supply chain as the cage, they anchor into the same deck the same way, and they age at the same points. Where a rail is required for a change in level, it has to be load-rated and it has to be anchored to hold that rating — which means the anchor schedule matters far more than the color.

What we do not do. We do not pour or repair concrete decks, we do not touch pool equipment or plumbing, we do not do roofing where a cage ties into a shingle roof line, and we do not do glass or vinyl panel conversions. All of those are somebody’s actual trade. We will tell you what your cage needs from them so it gets done in the right order.


Next step

Not sure which of these you have?

That is normal, and it is what the visit decides. Describe what you are seeing and somebody will tell you whether it is a panel, a rescreen or a frame.

Call (656) 236-2374 Request a measure

Bots On Staff · built for shops like yours

We built this one. The next one has your name on it.

What the chat on this page is doing

Ask about a rescreen and it puts the mesh choice honestly: a tighter no-see-um weave stops smaller insects, and it also cuts airflow and holds more wind. A real choice, not an upgrade.

It takes a name and a number and hands it straight over. Nothing here is held, booked or confirmed, and it will not price the job.

What it costs

website from $1,195, paid oncebots from $149 a month

The whole number, on the page. We build your first page free, on your own name, in 12–48 hrs — you look at it before any money moves.

What comes with it
  • Your Google Business Profile set up
  • Your local directory listings
  • A chat on your website that answers customers day and night
  • Every lead emailed to you
  • Your marketing platform: make posts to your website and your Google Business Profile, all from one place
  • Continuous updates for AI search: your posts go from the platform to your website and your Google Business Profile, keeping your business current for the people searching and the assistants that read it
  • One platform for your posts and leads, where your customers come from, and your ads if you add Google Ads
  • If you add Google Ads: see your Google Ads analytics, your spend each day and your keywords, day by day or across any date range, from the same platform
  • Every bot on staff for your trade
  • Your posts drafted for you to approve, for your website and Google Business Profile. Nothing goes out until you say so
  • The Ad Manager checks your Google Ads spend every morning, if you run ads
  • The referral program
  • The lead form, wired to you
  • The staff tools: scheduling, crew and documents
  • 30 minutes a month of website and Google Business Profile work (Starter has 15 minutes). It does not roll over to the next month.

It does not roll over to the next month.

Mini $49 a month (no bots) · Starter $149 a month (starting with bots) · Growth $249 a month (full bots). The website is priced on its own, paid once.

What you own

The website is yours to keep, on your own domain. The chat and the marketing stop with the service.

Thirty days’ notice, any time. No year, no lock.

One company per area. When yours is taken, it’s taken.

See every price How a build works →

Built by Bots on Staffget yours free

CallRequest a measure